CURRENT PROJECTS

February, 2018
Project

Golden Grove

Approximately 450 kilometers north-east of Perth and 280 kilometers east of Geraldton in Western Australia. Golden Grove is a EMR…

Golden Grove

Golden Grove

Approximately 450 kilometers north-east of Perth and 280 kilometers east of Geraldton in Western Australia. Golden Grove is a EMR Capital owned company that specializes in the private equity markets
Golden Grove is a copper, zinc, lead and precious metals based mine

ABOUT THE PROJECT

A Blast hole drilling program for the precious metals mine in Western Australia

CLIENT

MACA / EMR Capital

DATE

February, 2018

SHARE THE PROJECT

March, 2018
Project

Pilgangoora

Pilbara Minerals’ 100% owned Pilgangoora Lithium-Tantalum Project. Located 120km from Port Hedland in WA's resource-rich Pilbara region, is one of…

Pilgangoora

Pilgangoora

Pilbara Minerals’ 100% owned Pilgangoora Lithium-Tantalum Project. Located 120km from Port Hedland in WA's resource-rich Pilbara region, is one of the biggest new lithium ore (spodumene) deposits in the world, with a globally significant hard rock spodumene resource

ABOUT THE PROJECT

A Blast hole drilling program for the precious metals mine in Western Australia

CLIENT

MACA / Pilbara Minerals

DATE

March, 2018

SHARE THE PROJECT

July, 2017
Project

Woodie Woodie

The Woodie Woodie Manganese mine, located approximately 400km southeast of Port Hedland in the Pilbara region of Western Australia. The…

Woodie Woodie

Woodie Woodie

The Woodie Woodie Manganese mine, located approximately 400km southeast of Port Hedland in the Pilbara region of Western Australia. The mine is recognised internationally as a reliable independent supplier of high-grade, low-impurity manganese to global markets. Mining operations at Woodie Woodie utilise traditional open-pit mining methods, with ore being sourced from open pits and blended to maintain consistent product specifications. Total Reserves 25.5Mt.

ABOUT THE PROJECT

Blast hole + Grade Control drilling contract with Pilbara Manganese

CLIENT

Pilbara Manganese / Consolidated Minerals

DATE

July, 2017

SHARE THE PROJECT

August, 2016
Project

Tarcoola

Ongoing drilling support since Aug 2016 Resource estimates at Tarcoola, have identified a total resource estimated to be 973,000 tonnes…

Tarcoola

Tarcoola

Ongoing drilling support since Aug 2016
Resource estimates at Tarcoola, have identified a total resource estimated to be 973,000 tonnes averaging 3.12 g/t Au containing 97,000oz Au in the two main deposits – Perseverance and Last Resource. A total of 95% of the gold ounces in the mineral resource are in the Indicated category.
The Tarcoola Ore Reserve estimate, based on the mine design completed by independent mining engineering consultants Australian Mine Design and Development Pty Ltd for inclusion in the September 2016 feasibility study, is a total of 710,000 tonnes at 3.1 g/t gold containing 71,000 ounces.

More information »

ABOUT THE PROJECT

Ongoing Drilling support for WPG Resources

CLIENT

WPG Resources

DATE

August, 2016

SHARE THE PROJECT

January, 2014
Project

Minjar Gold Project

The Minjar Project is located 400km north northeast of Perth and is serviced via sealed roads from Geraldton and Perth.…

Minjar Gold Project

Minjar Gold Project

The Minjar Project is located 400km north northeast of Perth and is serviced via sealed roads from Geraldton and Perth. The project tenements cover an area of approximately 1,400km2 (with various mineral rights) over the prospective Yalgoo-Singleton Greenstone Belt (YSGB). The YSGB contains the world class Gossan Hill and Scuddles base metal deposits at Golden Grove (with current resources of 1.3Mt zinc, 587,000t copper, 811,000oz gold, 41.3Moz silver and 142,000t lead) and the 1.6 million ounce Mt Gibson gold project.

The Minjar Gold Project

ABOUT THE PROJECT

Minjar Gold Project – 150 – 200 BCM per month.

CLIENT

Minjar Gold

DATE

January, 2014

SHARE THE PROJECT

July, 2016
Project

Matilda Goldmine

The Matilda Gold Project incorporates over 780 square kilometers of tenements including Regent and the Matilda and Williamson Gold Mines…

Matilda Goldmine

Matilda Goldmine

The Matilda Gold Project incorporates over 780 square kilometers of tenements including Regent and the Matilda and Williamson Gold Mines containing total JORC 2012 resources of 48Mt @ 3.3 g/t for 5.1Moz of gold. These tenements cover around 45 kilometers of strike along the Wiluna Mine Sequence and 10 kilometers of strike along the Coles Find Sequence. The Wiluna Mine & Coles Find Sequence has historically produced 4 million ounces of gold.

More information »

ABOUT THE PROJECT

3yr Blast Hole Drilling Contract

CLIENT

Blackham Resources / MACA

DATE

July, 2016

SHARE THE PROJECT

COMPLETED PROJECTS

Northern Minerals Limited

Browns Range - May, 2017 - December, 2017

Browns Range

Browns Range

Located 160km south east of Halls Creek in northern Western Australia, the Browns Range Project (the Project) is positioned to become the first significant dysprosium producer outside of China.
Stage one includes the construction of a three year, 60,000tpa pilot plant operation at Browns Range. It will consist of an open cut mining operation, with processing via a beneficiation and hydrometallurgical pilot plant to produce 49,000kg dysprosium, in 590,000kg TREO contained in a mixed RE carbonate per annum

ABOUT THE PROJECT

Blast hole drilling contract with Northern Minerals

CLIENT

Northern Minerals Limited

DATE

May, 2017 - December, 2017

SHARE THE PROJECT

CU River Mining Australia

GARDEN WELL - February, 2017 - August, 2017

GARDEN WELL

GARDEN WELL

Garden Well is a shear hosted Archaean orogenic gold deposit located 100 km north of Laverton in the Duketon Greenstone Belt in Western Australia. It is the largest and most recent gold discovery in the Duketon area.
It is an Open pit mine with a reserve grade of 0.91g/t of gold and an 88% recovery – An ore reserve of 1.01Million oz and total mineral resources of 2.47 Million oz.

ABOUT THE PROJECT

Ongoing Drilling support for CU River Mining Australia

CLIENT

CU River Mining Australia

DATE

February, 2017 - August, 2017

SHARE THE PROJECT

CU River Mining Australia

Cairn Hill - January, 2017 - March, 2017

Cairn Hill

Cairn Hill

55 km south east of Coober Pedy, 16 km from the Stuart Highway and 90 km from the Wirrida Siding on the Tarcoola to Alice Springs railway in South Australia.
The re-launched mine will focus on extracting high-grade magnetite iron ore as well as copper from the site.

ABOUT THE PROJECT

Ongoing Drilling support for CU River Mining Australia

CLIENT

CU River Mining Australia

DATE

January, 2017 - March, 2017

SHARE THE PROJECT

MACA Limited

MMG Limited - Golden Grove - August, 2016 - February, 2017

Golden Grove

Golden Grove

Approximately 450 kilometers north-east of Perth and 280 kilometres east of Geraldton in Western Australia.The two underground mines produce zinc in zinc concentrate, copper in copper concentrate and a high precious metals (HPM) concentrate using sub-level stoping.

Golden Grove produced 55,131 tonnes of zinc and 26,048 tonnes of copper in 2015.

MMG expects Golden Grove to produce 45,0000-55,000 tonnes of zinc and 10,000-12,000 tonnes of copper in 2016.

More information »

ABOUT THE PROJECT

CLIENT

MMG Limited / MACA Limited

DATE

August, 2016 - February, 2017

SHARE THE PROJECT

MACA Limited

Doray Minerals - Deflector - February, 2016 - November, 2016

Deflector

Deflector

Deflector is a high-grade, gold-copper deposit located in the southern Murchison region of WA, 450km north of Perth and 160km east of the Western Australian regional city of Geraldton. It is located 350km from Andy Well. Deflector has an initial mine life of six years and significant exploration potential within the under-explored 7km-long ‘Deflector Corridor’.

ABOUT THE PROJECT

CLIENT

Doray Minerals / MACA Limited

DATE

February, 2016 - November, 2016

SHARE THE PROJECT

MACA Limited

Atlas Iron - Wodgina Minerals - May, 2015 - March, 2017

Wodgina Minerals

Wodgina Minerals

Atlas Iron's - Wodgina project is located approximately 100km south of Port Hedland via the Great Northern Highway with a mineral Resource of 40.3Mt. Wodgina has a remaining life of mine of approximately two years (as at June 2015), subject to ultimate production rates targeting.

More Information >>

ABOUT THE PROJECT

CLIENT

Atlas Iron / MACA Limited

DATE

May, 2015 - March, 2017

SHARE THE PROJECT

KINGSGATE CONSOLIDATED LTD

Challenger Gold Deposit - September, 2015 - November, 2015

Challenger Gold Deposit

Challenger Gold Deposit

The Challenger Gold Deposit was a virgin Gold Discovery made by Dominion Mining Ltd in May 1995. Open pit mining commenced in mid-2002 and plant and infrastructure was completed during the September 2002 Quarter. Plant commissioning commenced, on schedule, in late September 2002 and the first shipment of gold bullion was completed on 24 October 2002.

More information »

ABOUT THE PROJECT

CLIENT

KINGSGATE CONSOLIDATED LTD

DATE

September, 2015 - November, 2015

SHARE THE PROJECT

Regis Resources

Rosemont Gold Project - March, 2015 - June, 2015

Rosemont Gold Project

Rosemont Gold Project

The Rosemont gold deposit is 100% owned by Regis Resources Ltd and is located within 10 kilometres north west of the Garden Well Gold

Rosemont was discovered in the 1980s and was partially mined as a shallow oxide open pit by Aurora Gold Limited in the early 1990s. Reported production was 222kt at 2.65g/t for 18,600 ounces of gold. The remaining resource at Rosemont has been held outright by Regis since 2006.

More Information >>

ABOUT THE PROJECT

The Rosemont open pit gold mine has reserves of 664,000oz of gold. The combined indicated and inferred resources have been estimated at 1.73 billion ounces of gold

CLIENT

Regis Resources

DATE

March, 2015 - June, 2015

SHARE THE PROJECT

MACA Limited

SMC - Blue Hills Project - January, 2014 - April, 2015

Blue Hills Project

ABOUT THE PROJECT

CLIENT

SMC / MACA Limited

DATE

January, 2014 - April, 2015

SHARE THE PROJECT

MACA Limited

Arrium Mining & Minerals - Peculiar Knob - March, 2012 - March, 2015

Peculiar Knob

ABOUT THE PROJECT

CLIENT

Arrium Mining & Minerals / MACA Limited

DATE

March, 2012 - March, 2015

SHARE THE PROJECT

MACA Limited

Atlas Iron - Abydos Minesite - April, 2017 - August, 2017

Abydos Minesite

Abydos Minesite

The Abydos mine is located 130km south-southeast of Port Hedland
As at 30 June 2014, the Abydos mine had a Mineral Resource of 22.1Mt (17.1Mt indicated and 5Mt inferred) and an Ore Reserve of 11.3Mt (0.2Mt proved and 11.1Mt probable). Since 30 June 2014, approximately 3Mt has been mined from Abydos. As at 30 April 2015, over 5Mt of ore has been mined at Abydos since mining began.

More information »

ABOUT THE PROJECT

Ongoing Drilling support for MACA Mining

CLIENT

Atlas Iron / MACA Limited

DATE

April, 2017 - August, 2017

SHARE THE PROJECT

MACA Limited

Atlas Iron - Abydos - July, 2014 - September, 2014

Abydos

ABOUT THE PROJECT

CLIENT

Atlas Iron / MACA Limited

DATE

July, 2014 - September, 2014

SHARE THE PROJECT

MACA Limited

Karara Mining - Hinge Project - July, 2014 - January, 2015

Hinge Project

ABOUT THE PROJECT

CLIENT

Karara Mining / MACA Limited

DATE

July, 2014 - January, 2015

SHARE THE PROJECT

MACA Limited

Rosslyn Hill Mining - Rosslyn Hill - May, 2013 - October, 2013

Rosslyn Hill

ABOUT THE PROJECT

CLIENT

Rosslyn Hill Mining / MACA Limited

DATE

May, 2013 - October, 2013

SHARE THE PROJECT

MACA Limited

Sino Steel - Koolanooka - March, 2009 - January, 2013

Koolanooka

ABOUT THE PROJECT

CLIENT

Sino Steel / MACA Limited

DATE

March, 2009 - January, 2013

SHARE THE PROJECT

Mining and Civil Australia

Crescent Gold Fish project - November, 2011 - April, 2012

Crescent Gold Fish project

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

November, 2011 - April, 2012

SHARE THE PROJECT

Mining and Civil Australia

Western Areas Spotted Quoll - November, 2009 - March, 2012

Western Areas Spotted Quoll

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

November, 2009 - March, 2012

SHARE THE PROJECT

Mining and Civil Australia

Murchison Metals Limited - Crosslands Jack hills - September, 2006 - January, 2012

Crosslands Jack hills

ABOUT THE PROJECT

CLIENT

Murchison Metals Limited / Mining and Civil Australia

DATE

September, 2006 - January, 2012

SHARE THE PROJECT

HWE Mining Leighton

Woodie Woodie - August, 2008 - January, 2011

Woodie Woodie

ABOUT THE PROJECT

CLIENT

HWE Mining Leighton

DATE

August, 2008 - January, 2011

SHARE THE PROJECT

Davyhurst Gold Pty Ltd

Monarch Gold - July, 2007 - July, 2008

Monarch Gold

ABOUT THE PROJECT

CLIENT

Davyhurst Gold Pty Ltd

DATE

July, 2007 - July, 2008

SHARE THE PROJECT

Mining and Civil Australia

Mercator - May, 2007 - May, 2007

Mercator

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

May, 2007 - May, 2007

SHARE THE PROJECT

McMahons

BHP Orebody 18 - January, 2007 - April, 2007

BHP Orebody 18

ABOUT THE PROJECT

CLIENT

McMahons

DATE

January, 2007 - April, 2007

SHARE THE PROJECT

Mining and Civil Australia

Equigold NL Kirkalocka - July, 2007 - September, 2007

Equigold NL Kirkalocka

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

July, 2007 - September, 2007

SHARE THE PROJECT

Mining and Civil Australia

Harmony Gold Australia Pty Ltd Cue - January, 2006 - September, 2007

Harmony Gold Australia Pty Ltd Cue

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

January, 2006 - September, 2007

SHARE THE PROJECT

Mining and Civil Australia

Mincor Resources North Dordie - April, 2007 - October, 2007

Mincor Resources North Dordie

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

April, 2007 - October, 2007

SHARE THE PROJECT

Mining and Civil Australia

Gleneagle Gold Fortnum - June, 2006 - June, 2007

Gleneagle Gold Fortnum

ABOUT THE PROJECT

CLIENT

Mining and Civil Australia

DATE

June, 2006 - June, 2007

SHARE THE PROJECT

Leightons

BHP Yarrie/Nimingarra - June, 2005 - May, 2006

BHP Yarrie/Nimingarra

ABOUT THE PROJECT

CLIENT

Leightons

DATE

June, 2005 - May, 2006

SHARE THE PROJECT

Roche

Sally Malay Kimberley Nickel - January, 2003 - January, 2006

Sally Malay Kimberley Nickel

ABOUT THE PROJECT

CLIENT

Roche

DATE

January, 2003 - January, 2006

SHARE THE PROJECT

Roche

Ground Rush - January, 2001 - January, 2003

Ground Rush

ABOUT THE PROJECT

CLIENT

Roche

DATE

January, 2001 - January, 2003

SHARE THE PROJECT

Mass Drill and Blast have completed contracts with extensive contour drilling being required for:

Leightons Contractors

BHP Yarrie / Nimingarra operations

MacMahon Contracting

BHP Ore Body 18 / Jimbilbar operation

Mining and Civil

Jack Hills Haul Road access

Civil

Koolanooka open pit contract